|
|
DSpace at IIT Bombay >
Browsing by Author BABU, AS
Showing results 1 to 14 of 14
| Issue Date | Title | Author(s) | | 1988 | ANALYSIS OF INVENTORY POLICIES IN AN INTEGRATED PRODUCTION INVENTORY SYSTEM WITH DECAYING MATERIALS | GUNASEKARAN, A; BABU, AS; RAMASWAMY, N |
| 1988 | BEHAVIOR OF A PRODUCTION SYSTEM FOR VARYING MARKETING DECISIONS | GUNASEKARAN, A; BABU, AS; RAMASWAMY, N |
| 1991 | EFFECT OF MACHINE FAILURES IN A MULTISTAGE MULTI-FACILITY AND MULTIPRODUCT PRODUCTION-INVENTORY SYSTEM | GUNASEKARAN, A; GOYAL, SK; BABU, AS; RAMASWAMY, N |
| 1997 | Evolving requirements for a reengineering model for ferrous foundries in India - An experience | SHIVAPPA, DN; BABU, AS |
| 1979 | IMPACT OF REPAIR - ECHELON EFFECTIVENESS AND LOCATION ON SPARE STOCK | BABU, AS; VRAT, P |
| 1990 | LOT-SIZING IN A CLASS OF MULTISTAGE PRODUCTION INVENTORY SYSTEMS | GUNASEKARAN, A; BABU, AS; RAMASWAMY, N |
| 1990 | MACHINE ASSIGNMENT POLICIES IN A MULTISTAGE, MULTIFACILITY AND MULTIPRODUCT PRODUCTION INVENTORY SYSTEM | GUNASEKARAN, A; BABU, AS; RAMASWAMY, N |
| 1990 | A MODEL FOR INTEGRATED PROCUREMENT-PRODUCTION SYSTEMS | GOYAL, SK; DESHMUKH, SG; BABU, AS |
| 1998 | Multi-level scheduling decisions in a class of FMS using simulation based metamodels | SRIDHARAN, R; BABU, AS |
| 1991 | OPTIMIZATION OF A MULTISTAGE PRODUCTION-INVENTORY SYSTEM WITH SIGNIFICANT SET-UP OPERATION TIME | GUNASEKARAN, A; GOYAL, SK; BABU, AS; RAMASWAMY, N |
| 2005 | Optimization of continuous casting using simulation | KULKARNI, MS; BABU, AS |
| 1994 | A SIMULATION STUDY OF PERFORMANCE OF MRP BASED SYSTEMS UNDER INTERACTION EFFECTS | AGARWAL, G; BABU, AS |
| 1989 | SOME STUDIES ON INTEGRATED MULTISTAGE PRODUCTION-INVENTORY SYSTEMS | BABU, AS; DESHMUKH, SG |
| 2003 | A system of process models for estimating parameters of continuous casting using near solidus properties of steel | KULKARNI, MS; BABU, AS |
Showing results 1 to 14 of 14
|